There is a issue where updating a flow can cause an issue.
In the situation where a flow is live with 10,000+ contacts are moving through it.
A quick fix of a typo in a Send node or logic needs tuned in a Condition node to fix a problem.
I foresee an issue where no one is willing to publish these changes because our current options are to kick everyone out, forcing them to start over or let them continue in the old flow.
If the issue is fixing a broken link on a 30 day drip flow this leaves no good path forward.
This new option lets the user map old nodes to new nodes. This gives you full control over where to place contacts if they are mid flow.
